Blog
Prefab CFS Framing for Data Centers: Built in the Shop, Ready for the Schedule
Data centers demand precision, coordination, and speed. With extensive electrical and mechanical infrastructure, specialized cooling systems, and miles of cabling to accommodate, the framing system must do more than define the space. It must support a construction process in which multiple trades depend on accurate layouts, predictable installation, and tight sequencing. Prefabricated cold-formed steel (CFS)…
