Skip to content
Home | Projects | News | DRI1 Online Shopping E-Commerce

DRI1 Online Shopping E-Commerce

IMG_5204_crop

Project.

Scope: Renovation of existing building into a new location for e-commerce distribution
Builder: RC Andersen
Architect: BL Companies
Location: Providence, RI
Total LF of Steel Framing Manufactured and Installed: 675 LF Interior Walls
Total Panel Assemblies: 107
Floor Count: 1

Challenge:

Schedule: This job needed to done ASAP with substantial liquidated damages if it was not completed on time.

The NFS Solution:

Our team got to work immediately upon award of the contract to build in as much efficiency into the prefabbed assemblies as possible. The metal studs were assembled with blocking, bundled and shipped to the job site in just three days. The construction schedule then gave us six days to install the wall framing. Our team completed the job in three. Our system is not only beneficial for critical schedules but it allows the installation crew to be on the road less.

Search Our Blog

Categories

Process-Form-334x212

Have Questions?

Visit our frequently asked questions page to get some answers or email at info@network-framing.com

FAQS

Seeing is Believing

Tour our facility to see how it works.

  • This field is for validation purposes and should be left unchanged.

Visual
Glossary

Topper-VisualGlossary-780x350

Want to see what some prefabricated industry terms actually look like? A picture is worth a 1,000 words.

VISUAL GLOSSARY

Connect with us to learn how we can help with your next build.